Quality & Certifications
0 % First-Pass Yield

ISO 9001:2015

Quality management across every order, from quote to ship.

IATF 16949

Automotive-grade process control — PPAP, SPC, and MSA included.

AS9100D

Aerospace traceability down to the melt lot, kept for a decade.

ITAR Registered

Controlled programs handled by cleared staff on segregated systems.

Every Gear, Proven
Inspection isn't a department here — it's the workflow
01

Incoming Material

Mill certs verified; bar and forging stock stays quarantined until chemistry checks out.

02

First Article

Full dimensional and gear-analytics layout before any lot is released to production.

03

In-Process SPC

Operators chart critical features at the machine, every hour, on live dashboards.

04

CMM & Gear Lab

Lead, profile, pitch, and runout measured in a 20 °C climate-controlled lab.

05

Final Audit & Traceability

Serialized parts; measurement data archived and retrievable for ten years.

Coordinate measuring machine in the Vulcan metrology lab Coordinate measuring machine in the Vulcan metrology lab

Inside the Metrology Lab

  • Gear analyzer Klingelnberg P 26
  • CMM Mitutoyo CRYSTA-Apex S
  • Surface tester Mahr MarSurf PS 10
  • Roundness Taylor Hobson Talyrond 131
  • Environment 20 °C ± 0.5 °C, monitored 24/7
First-Pass Yield
On-Time Delivery
Customer PPM Commitments Met
Processes Kept In-House
Proof in Every Box

Charts, certs and hardness — the paperwork auditors want

Vulcan metrology lab
Finished ground gear

Need the paperwork?